“…The main technical requirements for these reactors are the following: (1) total electric power around 1.5 GW; (2) the tritium breeding ratio (TBR) ≥1.05-1.1; (3) the structural materials should withstand the first wall fluence up to [15][16][17][18][19][20] MWa/m 2 with the possible replacement of in-vessel components after 5-10 MWa/m 2 .…”
Section: Blanket Concepts For Demo Reactormentioning
confidence: 99%
“…The functional reactor facility (RITM-F) for tritium breeding models tests has been fabricated and put into operation [16,17]. The in-pile testing of breeding zone model for the CHC TBM in the conditions of permanent tritium extraction have been performed [18].…”
Section: Key Randd Issues Development Plansmentioning
“…The main technical requirements for these reactors are the following: (1) total electric power around 1.5 GW; (2) the tritium breeding ratio (TBR) ≥1.05-1.1; (3) the structural materials should withstand the first wall fluence up to [15][16][17][18][19][20] MWa/m 2 with the possible replacement of in-vessel components after 5-10 MWa/m 2 .…”
Section: Blanket Concepts For Demo Reactormentioning
confidence: 99%
“…The functional reactor facility (RITM-F) for tritium breeding models tests has been fabricated and put into operation [16,17]. The in-pile testing of breeding zone model for the CHC TBM in the conditions of permanent tritium extraction have been performed [18].…”
Section: Key Randd Issues Development Plansmentioning
“…The pebble model of the Test Module was discussed in [4]. At the concept development stage of DEMO, lithium orthosilicate was chosen as the tritium breeding material and beryllium pebbles as the neutron multiplying element.…”
Section: Pebble Model Of Solid Blanket Breeding Zone For Demo Test Momentioning
confidence: 99%
“…12,No. 4, However, ceramics have some drawbacks -the main one being a restricted service life of the TBZ, because lithium ceramics can only operate under neutron irradiation for a limited time.…”
Section: Introductionmentioning
confidence: 99%
“…The experimental value of the HTO/(HT þ HTO) ratio may serve as an initial requirement for the design of the tritium system of the ITER Test Module. A period of reactor operation, corresponding to the time needed for the reactor to reach full power, is described in [4].…”
Main results of in-pile reactor testing of the first model of the tritium breeding zones (TBZ) for fusion reactor blankets containing both lithium orthosilicate and beryllium spheroid particles are presented. Experimental results of tritium inflow -in the form of HT and HTO -into neon purge-gas with or without 1% hydrogen are discussed.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.