Model Development of Amine Regeneration Process with Electrodialysis Reclamation Unit

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
6
1

Relationship

4
3

Authors

Journals

citations
Cited by 18 publications
(4 citation statements)
references
References 2 publications
0
4
0
Order By: Relevance
“…The objective of a technical economic assessment of a process is to provide a basis for judging the possibility of investment by preliminarily reviewing the economic feasibility at the process development stage [ 23 , 24 ]. In this study, the feasibility of the two proposed processes for PLA evaporation was reviewed to determine the most economical process by comparing the economic feasibility of the two alternative processes with that of the existing process.…”
Section: Resultsmentioning
confidence: 99%
“…The objective of a technical economic assessment of a process is to provide a basis for judging the possibility of investment by preliminarily reviewing the economic feasibility at the process development stage [ 23 , 24 ]. In this study, the feasibility of the two proposed processes for PLA evaporation was reviewed to determine the most economical process by comparing the economic feasibility of the two alternative processes with that of the existing process.…”
Section: Resultsmentioning
confidence: 99%
“…First, the EAC is determined from the total capital investment ( TCI ) and annuity factor ( AF ): where TCI denotes the capital investment, which includes equipment cost, land cost, installation cost, etc. The TCI is determined from the fixed capital investment ( FCI ) , working capital investment ( WCI ), and start-up cost ( SUC ): …”
Section: Methodsmentioning
confidence: 99%
“…The TAC is calculated from the equivalent annual cost (EAC) and total product cost (TPC): 58,59 = = + TAC EAC TPC total cost (15) First, the EAC is determined from the total capital investment (TCI) and annuity factor (AF): 60 = EAC TCI AF (16) where TCI denotes the capital investment, which includes equipment cost, land cost, installation cost, etc. The TCI is determined from the fixed capital investment (FCI), working capital investment (WCI), and start-up cost (SUC): 61 = + + TCI FCI WCI SUC (17) FCI is the cost that includes building cost, plumbing cost, installation cost of equipment, etc., and it is determined from the total equipment cost of sorting and recycling system: 58 (18) where C equipment is the calculated sum of the equipment cost of the sorting system (EC sorting ), material recycling (EC material ), chemical recycling (EC chemical ), thermal recycling (EC thermal ), and incineration (EC energy recovery ):…”
Section: ■ Materials and Methodsmentioning
confidence: 99%
“…Further, the TPC can be expressed as the sum of fixed charges (FCs), direct production cost (DPC), plant overhead cost (OVHD), and general expenses (GE). 24 TPC…”