2007
DOI: 10.3182/20070606-3-mx-2915.00134
|View full text |Cite
|
Sign up to set email alerts
|

Model Predictive Control of Integrated Quantity and Quality in Drinking Water Distribution Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2009
2009
2021
2021

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 14 publications
(3 citation statements)
references
References 14 publications
0
3
0
Order By: Relevance
“…The distributed RFMPC was applied at LCL for the first time in (Chang et al, 2003). The single agent with centralized MPC with full hydraulics and quality information feedback achieving robust constraint satisfaction by fixed safety zones was applied for the first time to the integrated quantity and quality control problem in (Drewa et al, 2007) and it is presented in section 5.2.3. The multiagent structure and algorithms for the two time scale hierarchical controller with RFMPC at both control layers are under development.…”
Section: A Single Agent -Centralized Two Time Scale Hierarchical Contmentioning
confidence: 99%
“…The distributed RFMPC was applied at LCL for the first time in (Chang et al, 2003). The single agent with centralized MPC with full hydraulics and quality information feedback achieving robust constraint satisfaction by fixed safety zones was applied for the first time to the integrated quantity and quality control problem in (Drewa et al, 2007) and it is presented in section 5.2.3. The multiagent structure and algorithms for the two time scale hierarchical controller with RFMPC at both control layers are under development.…”
Section: A Single Agent -Centralized Two Time Scale Hierarchical Contmentioning
confidence: 99%
“…The PRV scheduling algorithm can be used for off-line planning studies such as assessing the benefits of introducing the leakage management or for on-line pressure control, which may be implemented in either predictive control or feedback control as a real time control scheme Drewa et al, 2007). Predictive control calculates the optimal PRV schedules at each interval of time by the optimal scheduling algorithm, using updated demand prediction.…”
Section: The Solution Of the Pressure Optimisation Problemmentioning
confidence: 99%
“…MPC was successfully applied originally to minimize the cost of pumping [5][6][7][8]. Others took a more general approach using MPC, gaining good optimization and control of water quality and quantity in municipal systems as a whole [9][10][11][12][13][14]. An excellent feature article was published in 2002 providing an overview of feedback control as it applies to water quality [15].…”
Section: Literature Reviewmentioning
confidence: 99%