“…Using the proposed method, with thresholds of indicators set as 0, through 20,000 samplings of dynamic metro operation scenarios, the installation probabilities of optimized placement results are shown in Figure 11. Substations 2,5,6,12,13,22,23,61,62,64,67,70, and 71 need to have BDs installed, and the BD installation probability exceeds 90 % with the train operations. Among them, the probability percentage of substations 7, 26, 72, and 73 is less than 20%.…”