1997
DOI: 10.1007/bf02744129
|View full text |Cite
|
Sign up to set email alerts
|

Modelling and simulation of just-in-time flexible systems

Abstract: The increasing worldwide competition requires economical manufacture, high quality and short delivery time. The Just-In-Time (JIT) philosophy of manufacturing is increasingly being considered by manufacturing organizations, as a response to the increased pressure to supply high quality products with short delivery times and at low cost. A very simple shop floor control system that was developed by Toyota in the 1970s specifically for their Just-In-Time assembly plant, has received considerable attention in the… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2013
2013
2018
2018

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 14 publications
0
0
0
1
Order By: Relevance
“…Además de los anteriores trabajos, otros autores trabajan la implementación de las diferentes políticas a líneas de montaje en plantas reales, SP2. Raju et al (1997) trabajan en el modelado, la simulación y la implementación del suministro JIT en un sistema de montaje. Para ello realizan una simulación para analizar el sistema kanban y la reacción del sistema ante diferentes cambios en los parámetros.…”
Section: Determinación De Políticas De Suministro (Sp)unclassified
“…Además de los anteriores trabajos, otros autores trabajan la implementación de las diferentes políticas a líneas de montaje en plantas reales, SP2. Raju et al (1997) trabajan en el modelado, la simulación y la implementación del suministro JIT en un sistema de montaje. Para ello realizan una simulación para analizar el sistema kanban y la reacción del sistema ante diferentes cambios en los parámetros.…”
Section: Determinación De Políticas De Suministro (Sp)unclassified