According to the occurrence condition of one mine’s primary face coal seam and using the methods of theoretical calculation and numerical analysis, this paper determined the reasonable parameters of the high-water material filling body and made an industrial test in the field haulage entry. The results showed that the parameters of the filling body were reasonable and the filling body can maintain the roof of the entry effectively and obtain good supporting results.