2018
DOI: 10.1016/j.jhydrol.2018.06.038
|View full text |Cite
|
Sign up to set email alerts
|

Moraine dam breach and glacial lake outburst flood generation by physical and numerical models

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 52 publications
(16 citation statements)
references
References 63 publications
0
16
0
Order By: Relevance
“…For embankment and moraine-dammed lakes, there are two main approaches to computing dam failure: (i) numerical models based on mass and momentum balance equations supplemented by erosion laws (Begam et al, 2018;Castro-Orgaz & Hager, 2013;Faeh, 2007;Larocque et al, 2013), and (ii) conceptual models based on a series of differential equations accounting for the various processes at play (Capart, 2013;Peter et al, 2018;Walder & O'Connor, 1997). For ice-dammed lakes, the water's change phase should also be considered.…”
Section: Drainage and Dam Breakmentioning
confidence: 99%
“…For embankment and moraine-dammed lakes, there are two main approaches to computing dam failure: (i) numerical models based on mass and momentum balance equations supplemented by erosion laws (Begam et al, 2018;Castro-Orgaz & Hager, 2013;Faeh, 2007;Larocque et al, 2013), and (ii) conceptual models based on a series of differential equations accounting for the various processes at play (Capart, 2013;Peter et al, 2018;Walder & O'Connor, 1997). For ice-dammed lakes, the water's change phase should also be considered.…”
Section: Drainage and Dam Breakmentioning
confidence: 99%
“…Second, the dam break process was considered as a process where dam materials were eroded by the overtopping flow [47]. The excavation of diversion channels prolongs the dam break time, and reduces the water level and upstream water storage capacity when the artificially induced overtopping occurs.…”
Section: Discussionmentioning
confidence: 99%
“…There are three reasons why another landslide was referenced here. Firstly, the excavation of a diversion channel was also used for this landslide to discharge Second, the dam break process was considered as a process where dam materials were eroded by the overtopping flow [47]. The excavation of diversion channels prolongs the dam break time, and reduces the water level and upstream water storage capacity when the artificially induced overtopping occurs.…”
Section: Discussionmentioning
confidence: 99%
“…Seasonal flooding, as well as glacial lake outburst floods (GLOFs) are common in glacial systems, especially wet-based valley glaciers (e.g., Davies et al, 2003;Dessouki, 2009;Cui et al, 2010;Begam et al, 2018;Neupane et al, 2019). The rapid release of a large volume of water during outburst flood events produces a variety of deposits.…”
Section: Outburst Flood Depositsmentioning
confidence: 99%