2013
DOI: 10.1016/j.cie.2013.03.014
|View full text |Cite
|
Sign up to set email alerts
|

Multi-objective optimization of stochastic disassembly line balancing with station paralleling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
34
0
2

Year Published

2014
2014
2024
2024

Publication Types

Select...
5
3
2

Relationship

0
10

Authors

Journals

citations
Cited by 127 publications
(36 citation statements)
references
References 44 publications
0
34
0
2
Order By: Relevance
“…Altekin and Akkan [14] proposed a predictive model of task failures for a disassembly line in order to recover the loss of performance when task failures occurred. Aydemir-Karadag and Turkbey [15] established a mathematical model for a parallel disassembly line based on the AND/OR Graph. Kalayci et al [16] discussed the influence on the removal order of hazardous components and presented a mathematical formula relevant to a sequence-dependent disassembly line.…”
Section: Disassembly Line Evaluation and Optimizationmentioning
confidence: 99%
“…Altekin and Akkan [14] proposed a predictive model of task failures for a disassembly line in order to recover the loss of performance when task failures occurred. Aydemir-Karadag and Turkbey [15] established a mathematical model for a parallel disassembly line based on the AND/OR Graph. Kalayci et al [16] discussed the influence on the removal order of hazardous components and presented a mathematical formula relevant to a sequence-dependent disassembly line.…”
Section: Disassembly Line Evaluation and Optimizationmentioning
confidence: 99%
“…La quasi-totalité des papiers s'intéressent aux incertitudes des durées opératoires des tâches de désassem-blage. Nous pouvons citer Turowski et Morgan (2005) ; Agrawal et Tiwari (2006) ; Aydemir-Karadag et Turkbey (2013). En particulier, les travaux dans Bentaha et al (2013a ;2013b ;2013c ;2013d ;2013e) ;Bentaha, Battaïa, Dolgui et Hu (2014) ;Bentaha, Battaïa et Dolgui (2014a ;2014b ;2014c) ; ; , proposent des modélisations et des approches de résolution exactes permettant la sélection de la meilleure alternative de désassemblage sous incertitudes des durées opératoires des tâches.…”
Section: Revue De Littératureunclassified
“…Task times were assumed to be stochastic with known normal probability distributions. A binary bi-objective non linear program was developed in Aydemir- Karadag and Turkbey (2013) for DLBP under uncertainty of the task times. Task times were assumed to be independent random variables with known normal probability distributions.…”
Section: Disassembly Line Design and Balancingmentioning
confidence: 99%