2014
DOI: 10.1155/2014/369350
|View full text |Cite
|
Sign up to set email alerts
|

Multitask Oriented Virtual Resource Integration and Optimal Scheduling in Cloud Manufacturing

Abstract: To deal with the problem of resource integration and optimal scheduling in cloud manufacturing, based on the analyzation of the existing literatures, multitask oriented virtual resource integration and optimal scheduling problem is presented from the perspective of global optimization based on the consideration of sharing and correlation among virtual resources. The correlation models of virtual resources in a task and among tasks are established. According to the correlation model and characteristics of resou… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0

Year Published

2015
2015
2018
2018

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 36 publications
(15 citation statements)
references
References 12 publications
0
15
0
Order By: Relevance
“…Cheng et al (2014) studied multi-task-oriented scheduling in cloud manufacturing taking virtual resource correlations into account. The tasks they considered have completely identical subtask execution flows and thus require the same candidate resource sets.…”
Section: Service and Task Schedulingmentioning
confidence: 99%
“…Cheng et al (2014) studied multi-task-oriented scheduling in cloud manufacturing taking virtual resource correlations into account. The tasks they considered have completely identical subtask execution flows and thus require the same candidate resource sets.…”
Section: Service and Task Schedulingmentioning
confidence: 99%
“…DF i,j , CS i,j , BS i,j 0.8540 C 10 DF i,j , CS i,j , QU i,j 0.7149 C 11 DF i,j , BS i,j , ME i,j 0.4255 C 12 NP i,j , MS i,j , SD i,j 0.9206 C 13 NP i,j , MS i,j , TC i,j 0.8757 C 14 NP i,j , MA i,j 0.4294 C 15 NP i,j , CS i,j , TC i,j 0.8521 C 16 NP i,j , ME i,j 0.8038 C 17 MS i,j , SD i,j , RU i,j 0.9946 C 18 MS i,j , RS i,j , TC i,j 0.1193 C 19 MS i,j , QU i,j 0.8209 C 20 MS i,j , TC i,j , RU i,j 0.5309 C 21 MA i,j , PE i,j 0.9671 C 22 MA i,j , RU i,j 0.6952 C 23 OD i,j , RU i,j 0.2307 C 24 SD i,j , TE i,j 0.7174 C 25 BS i,j , ME i,j , TE i,j 0.6907 C 26 RS i,j , ME i,j , TE i,j 0.8250 C 27 ME i,j , PE i,j 0.9906 …”
Section: Cliquementioning
confidence: 99%
“…They only considered facility type to match each request to a set of enterprises, and the facility type reflects the resource type the facility retains. Considering the resource type each enterprise retains, Cheng et al [22] tackled a scheduling problem in CM where enterprises share their resources with each other.…”
Section: Introductionmentioning
confidence: 99%
“…Cheng et al [42] studied multitask oriented virtual resource integration and optimal scheduling in CMfg based on the consideration of sharing and correlation among virtual resources. Tao et al [43] developed a parallel intelligent algorithm for service composition optimal-selection in the CMfg system, in which numerous criteria, especially service-oriented criteria such as reliability, maintainability, trust, and function similarity, are taken into consideration.…”
Section: Literature Reviewmentioning
confidence: 99%