2018
DOI: 10.1109/tie.2017.2760852
|View full text |Cite
|
Sign up to set email alerts
|

Natural Frame Control of Single-Phase Cascaded H-Bridge Multilevel Converter Based on Fictive-Phases Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
32
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
8

Relationship

5
3

Authors

Journals

citations
Cited by 18 publications
(32 citation statements)
references
References 29 publications
0
32
0
Order By: Relevance
“…The natural frame control scheme presented in [23] also shows the advantages of no coordinate transformation, PLL, or conventional imaginary current construction. Differ from the natural frame control scheme, the proposed scheme connects power control with current control through the instantaneous power theory.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…The natural frame control scheme presented in [23] also shows the advantages of no coordinate transformation, PLL, or conventional imaginary current construction. Differ from the natural frame control scheme, the proposed scheme connects power control with current control through the instantaneous power theory.…”
Section: Discussionmentioning
confidence: 99%
“…To accurately obtain the information on the grid voltage including the amplitude and phase angle, some advanced PLLs have been proposed, such as hybrid filtering technique-based PLL [19], grid sequence separator PLL [20], frequency-fixed SOGI-based PLL [21], and repetitive learning-based PLL [22]. However, the computational complexity of coordinate transformation and PLL increases the calculation burden of the embedded processor like the digital signal processor (DSP) [23]. Therefore, the development of a convenient control method without PLL or coordination transformation is appealing.…”
Section: Introductionmentioning
confidence: 99%
“…To obtain the fictional three-phase grid voltage flux linkage value, the fictive-phase construction (FPC) is used to construct the three-phase VF signal [19]. Combining 7and (8), the VF expression in the natural frame is deduced as:…”
Section: B Principle Of Vf Estimatormentioning
confidence: 99%
“…This method has a higher dynamic and steady state performance, but the implementation process is more complicated at the cost of increasing the computational burden of the digital signal processor (DSP). Considering the computational complexity of the control process, a natural frame control, proposed in [19], does not require coordinate transformation and phase-locked loop (PLL) by introducing active voltage unit vector (AVUV) and reactive voltage unit vector (RVUV) into the natural frame, which effectively improves the power quality of the system and reduces the delay.…”
Section: Introductionmentioning
confidence: 99%
“…Replacing the diodes in the traditional buck-boost circuit with MOSFET transistors enables bidirectional power transfer and continuous current mode [28][29][30][31][32]. e system flow of the equalization technology is shown in Figure 1.…”
Section: Operating Principle and Designmentioning
confidence: 99%