“…In the literature, AHP method has been applied to different fields such as strategic planning (Arbel and Orger, 1990), evaluation of advanced construction technology (Skibniewski and Chao, 1992), warehouse site selection (Korpela and Tuominen, 1996), strategic investment analysis (Angels and Lee, 1996), facility location selection (Yang and Lee, 1997), project management (Al Harbi, 2001), software selection (Lai et al, 2002;Karaarslan and Gundogar, 2009), managing risk in supplay chain (Gaudenzi and Borghesi, 2006), selection process for a project variant (Cabała, 2010), supplier selection (Bruno et al, 2012), inventory classification (Lolli et al, 2014), energy management (Jovanovic´ et al, 2015), identifying the factors affecting on labor productivity of construction projects (Sherekar and Tatikonda, 2016), risk evaualtion (Zeng and Xu, 2017), assessing renewable energy sources (Nasirov et al, 2017). In addition, AHP method has been also used in the literature to determine the weights of the criteria in MCDM problems.…”