2020
DOI: 10.1061/(asce)co.1943-7862.0001773
|View full text |Cite
|
Sign up to set email alerts
|

New Model for Identifying Critical Success Factors Influencing BIM Adoption from Precast Concrete Manufacturers’ View

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
33
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
1
1

Relationship

2
5

Authors

Journals

citations
Cited by 50 publications
(34 citation statements)
references
References 50 publications
1
33
0
Order By: Relevance
“…Precast concrete companies are mostly small and medium-sized enterprises (SMEs) [9]. While LM tools such as VSM, Kanban/pull, and TPM are mostly utilized, literature reviews from past journals show that JIT production is rarely implemented in SMEs [10].…”
Section: Introductionmentioning
confidence: 99%
“…Precast concrete companies are mostly small and medium-sized enterprises (SMEs) [9]. While LM tools such as VSM, Kanban/pull, and TPM are mostly utilized, literature reviews from past journals show that JIT production is rarely implemented in SMEs [10].…”
Section: Introductionmentioning
confidence: 99%
“… Investigation done by Phang et al (2019) has shown that majority of the PC manufacturers are at BIM maturity level 0 or level 1. It can also imply the extent of IT usage is low in most construction projects.…”
Section: The It Usage In the Pc Supply Chainmentioning
confidence: 99%
“…According to the study by Phang et al (2019), to realise the full potential of IT, the whole ecosystem needs to embrace it, and not just merely the responsibility of a single party. In other words, there should be appropriate technologies, processes and collaborative behaviours between and within organisations, along the supply chain.…”
Section: The It Usage In the Pc Supply Chainmentioning
confidence: 99%
See 2 more Smart Citations