This article will show how a standardized rule-based approach was used by Petroleum Development Oman (PDO) to shorten the cycle time required to mature the opportunity of implementing waterflood developments in small-to-medium sized satellite oil fields in the South of the Sultanate of Oman. The standardized concept relies on a common development strategy for a portfolio of satellite fields with similar reservoir and fluid characteristics that are still under depletion or in the early stage of waterflood. The targets are early monetization, driving cost efficiency through standardization & replication, and increasing recovery factor through the accelerated implementation of field-wide waterflood. This is achieved by leveraging excess capacity in existing facilities, applying analytical workflows for forecasting, standardizing well design and urban planning, and by applying the learnings and best practices from nearby fields that already have mature developments.