2018
DOI: 10.1353/sls.2018.0014
|View full text |Cite
|
Sign up to set email alerts
|

Numeral Variation in Yucatec Maya Sign Languages

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
15
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 19 publications
(15 citation statements)
references
References 14 publications
0
15
0
Order By: Relevance
“…With the total distance learning, this connection gets nearly lost, since the student does not meet with the instructor even at tests. In the video conference mode, you can answer some of the students' questions, but such feedback is severely compromised due to the lack of visual contact [9][10][11]. The similarity of this contact could be provided by conducting a video call conversation in a messenger, which was performed by some instructors of the Don State Technical University.…”
Section: Resultsmentioning
confidence: 99%
“…With the total distance learning, this connection gets nearly lost, since the student does not meet with the instructor even at tests. In the video conference mode, you can answer some of the students' questions, but such feedback is severely compromised due to the lack of visual contact [9][10][11]. The similarity of this contact could be provided by conducting a video call conversation in a messenger, which was performed by some instructors of the Don State Technical University.…”
Section: Resultsmentioning
confidence: 99%
“…At the same time, quality control is carried out by both the receiving contractor and an independent expert on the part of the developer. The examination is carried out without stopping production using integrated systems for evaluating deadlines, volumes, and resources according to the reporting system entered in the databases of all participants in the process, as well as visual and instrumental methods, reporting on which is also recorded in the database and processed in the automated control system [8][9][10].…”
Section: Resultsmentioning
confidence: 99%
“…Expert audit control is carried out immediately at a given technological stage, without diverting additional resources to the preparation and with the maximum possible objectivity of the construction analysis as a whole and the specific audit stage [7]. However, even at the stage of audit control, communication difficulties may arise among control participants and performers of the work due to their language barrier [8][9][10].…”
Section: Methodsmentioning
confidence: 99%
“…It should be understood that when an organization uses information modeling technologies for buildings and structures, its structure changes in comparison with the traditional one based on two-dimensional design. Figure 1 shows part of the structure of a design firm working in the field of BIM [7][8][9]. As can be seen from Figure 1, the strategic functions of implementing and developing BIM processes are performed by the BIM manager, while the direct coordination of the project team is carried out by the BIM coordinator.…”
Section: Methodsmentioning
confidence: 99%