“…Segmented work at the design stages is replaced by a continuous process. This is achieved by changing the design technology substantially and switching from the development of a set of 2D (two-dimensional) drawings to the development of a 3D computer-aided model of a building, comprising all the constituent parts of the design process, such as architectural, structural, mechanical, technological and construction process management and evaluation [14,15,21,32].…”