2006
DOI: 10.1016/j.mcm.2005.12.013
|View full text |Cite
|
Sign up to set email alerts
|

On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
28
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 63 publications
(28 citation statements)
references
References 34 publications
0
28
0
Order By: Relevance
“…This research extended the work of Lin and Gong (2006) by introducing a production reorder point to help reduce the expected value of the total cost per unit time. From numerical analysis, it has been found that the production reorder point had significant impact on the total cost function.…”
Section: Conclusion and Recommendationsmentioning
confidence: 98%
See 2 more Smart Citations
“…This research extended the work of Lin and Gong (2006) by introducing a production reorder point to help reduce the expected value of the total cost per unit time. From numerical analysis, it has been found that the production reorder point had significant impact on the total cost function.…”
Section: Conclusion and Recommendationsmentioning
confidence: 98%
“…Finally, from the total inventory cost expression they derived expression for optimal number of production setups that minimize the total cost. Lin and Gong (2006) considered the impact of random machine breakdowns on the classical economic production quantity (EPQ) model for an item subject to exponential decay and under a no-resumption (NR) inventory control policy. They assumed constant demand rate, finite production rate, fixed repair time and infinite planning horizon.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The development of an appropriate recovery policy can help to minimize the loss and maintain the goodwill of the company. Lin and Gong [5] analysed the impact of machine breakdown on EPQ model for deteriorating items in a single stage production system with fixed period of repair time. Widyadana and Wee [6] extended the model of Lin and Gong [5] for deteriorating items with random machine breakdown and stochastic repair time with uniform and exponential distribution.…”
Section: Introductionmentioning
confidence: 99%
“…Lin and Gong [5] analysed the impact of machine breakdown on EPQ model for deteriorating items in a single stage production system with fixed period of repair time. Widyadana and Wee [6] extended the model of Lin and Gong [5] for deteriorating items with random machine breakdown and stochastic repair time with uniform and exponential distribution. A disruption recovery model for single stage and single item production system is developed by Hishamuddin et al [7] and the model was formulated for a single disruption, for recovering within a given time window, considering back order as well as lost sales option.…”
Section: Introductionmentioning
confidence: 99%