On-line partial discharge monitoring system for distribution networks

Abstract: Partial discharges (PD) occur as a result of dielectric breakdown in electrical insulation under high voltage stress. PD activity, once initiated, causes chemical and physical degradation of insulating material and can lead to catastrophic failure. Early warning of PD activity and localisation is considered essential to ensure the reliable operation over the long term of high voltage equipment including cables, cable accessories and switchgear. PD detection in high voltage cable and cable accessories is usuall… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
5
0

Year Published

2013
2013
2021
2021

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 12 publications
(5 citation statements)
references
References 4 publications
0
5
0
Order By: Relevance
“…As mentioned before, this method is inapplicable for on-line PD measurements because the electrical noise on-site is normally very high. However, the acquisition system through a coupling capacitor, plugged into the cable terminals within switchgear cable compartments, can be used to perform on-line measurements when the signals are processed in the HF range [ 29 , 30 ].…”
Section: Measuring Methods Sensors and Measurement Devicesmentioning
confidence: 99%
“…As mentioned before, this method is inapplicable for on-line PD measurements because the electrical noise on-site is normally very high. However, the acquisition system through a coupling capacitor, plugged into the cable terminals within switchgear cable compartments, can be used to perform on-line measurements when the signals are processed in the HF range [ 29 , 30 ].…”
Section: Measuring Methods Sensors and Measurement Devicesmentioning
confidence: 99%
“…However, for asset management and preventative maintenance purposes the trending of these parameters over time [4,5,6] is a key indicator of when assets may fail. This paper presents continuing observations from a monitoring system installed as part of trials in a typical Spanish urban distribution network [7] SYSTEM ARCHITECTURE An overview of the system architecture employed in this trial can be seen in Figure 3 Using in-house developed capacitive coupling units, installed directly into T-junction cable end-plugs within the switchgear enclosure, it is possible to simultaneously capture both high frequency and voltage signals due to the integrated quadripole. This simultaneous measurement allows for PRPD patterns to be easily represented.…”
Section: Introductionmentioning
confidence: 99%
“…2, April 2020 : 427 -435 428 bridges the insulation between the conductor and may or may not occur adjacent to the conductor [10]. The high precision of the PD measurement system is essential for capturing PD activity as it occurs in the short duration of current pulses, usually for only a few nanoseconds [11][12][13]14]. PD usually occurs before the breakdown indicates that PD monitoring can be a good system to install, with reference to data from [15].…”
Section: Introductionmentioning
confidence: 99%