On Site Measurement and Simulation of Transferred Lightning Overvoltages Through Power Transformers

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(8 citation statements)
references
References 24 publications
0
8
0
Order By: Relevance
“…Simulated overvoltages consist of lightning strike overvoltage and system response, which is quite complex due to numerous reflections inside the substation and between adjacent substations connected with 110 kV overhead lines. More specifics on modelling can be found in [10]. The amplitude of the simulated overvoltage is comparable to the measured ones while the oscillations following the initial overvoltage differ due to lack of damping in the model.…”
Section: Emtp Simulation Inlcuding High Frequency Transformer Modellingmentioning
confidence: 57%
See 3 more Smart Citations
“…Simulated overvoltages consist of lightning strike overvoltage and system response, which is quite complex due to numerous reflections inside the substation and between adjacent substations connected with 110 kV overhead lines. More specifics on modelling can be found in [10]. The amplitude of the simulated overvoltage is comparable to the measured ones while the oscillations following the initial overvoltage differ due to lack of damping in the model.…”
Section: Emtp Simulation Inlcuding High Frequency Transformer Modellingmentioning
confidence: 57%
“…2. Frequency dependent admittance matrix coefficient for a 150 MVA transformer unit [9] Once the model is established, it can be used in EMTP to simulate overvoltages [10]. An example of EMTP simulation of a lightning strike to a 220 kV overhead line tower, which led to flashover in phase B, following by the flashover in phase A, is given below.…”
Section: Emtp Simulation Inlcuding High Frequency Transformer Modellingmentioning
confidence: 99%
See 2 more Smart Citations
“…A common approach is to measure voltage transients across the bushing measuring taps of power transformers or reactors [4]. A special bushing tap adapter and measuring impedance need to be designed in order to accurately transfer the overvoltage amplitude and shape to the low voltage side.…”
Section: Transformer Transient Monitoring Systemmentioning