Online Transient Measurements of EHV Cable System and Model Validation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(12 citation statements)
references
References 13 publications
0
12
0
Order By: Relevance
“…With ten unknowns (for unsynchronized measurements) and six fitted parameters also other sources of information must be employed. Reduction of the number of independent components M ij can be achieved by neglecting components when these are very small, or by having a symmetric positioning of sensors with respect to the phase conductors meaning that various matrix components are equal [7,10]. Also parameter estimates can be made and their uncertainties can be retrieved, e.g., from comparison with numerical electrostatic field simulations on the system.…”
Section: Measurement Analysis and Uncertaintymentioning
confidence: 99%
See 4 more Smart Citations
“…With ten unknowns (for unsynchronized measurements) and six fitted parameters also other sources of information must be employed. Reduction of the number of independent components M ij can be achieved by neglecting components when these are very small, or by having a symmetric positioning of sensors with respect to the phase conductors meaning that various matrix components are equal [7,10]. Also parameter estimates can be made and their uncertainties can be retrieved, e.g., from comparison with numerical electrostatic field simulations on the system.…”
Section: Measurement Analysis and Uncertaintymentioning
confidence: 99%
“…Which assumptions are to be made and what the effects will be on the uncertainty margins are specific for the configuration at the measurement site. Measurements of energization transients are obtained from a double circuit 380 kV line-cable-line connection [7]. More specifically, measurements were taken at the underground cable to overhead line transition points (at both cable ends) and near an overhead line termination at one of the substations.…”
Section: Measurement Analysis and Uncertaintymentioning
confidence: 99%