2020
DOI: 10.1002/er.5432
|View full text |Cite
|
Sign up to set email alerts
|

Optimal day‐ahead coordination on wind‐pumped‐hydro system by using multiobjective multistage model

Abstract: Summary This research is motivated by the practice of a well‐known basin—the Yalong River Basin located in the eastern part of the Qinghai‐Tibet Plateau in China, which requires a more reasonable day‐ahead scheduling and operation of a wind‐pumped‐hydro system. Optimal electricity flow remains a widely‐cultivated topic within power system research community since its inception about half‐a‐century ago. In contrast to previous studies, this article proposes a multiobjective multistage nonlinear model to not onl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 37 publications
0
3
0
Order By: Relevance
“…On the other hand, electricity generation via both hydropower plant and wind farm will occur when the constraints (8) and (27) are satisfied, (see (27)). Whenever volume of energy stored or electricity generation in the hydropower plant does not satisfy (8) or when condition (28) is observed, the electricity generated in the wind farm should be sold directly to the grid, (see (28)). Figure 3 illustrates the methodology used to schedule the wind-hydro system operation.…”
Section: Heuristic Methodology To Generate Solutions-day-ahead Approachmentioning
confidence: 99%
See 1 more Smart Citation
“…On the other hand, electricity generation via both hydropower plant and wind farm will occur when the constraints (8) and (27) are satisfied, (see (27)). Whenever volume of energy stored or electricity generation in the hydropower plant does not satisfy (8) or when condition (28) is observed, the electricity generated in the wind farm should be sold directly to the grid, (see (28)). Figure 3 illustrates the methodology used to schedule the wind-hydro system operation.…”
Section: Heuristic Methodology To Generate Solutions-day-ahead Approachmentioning
confidence: 99%
“…Linear programming and, mainly mixed-integer linear programming [27], is the standard approach to model hydro scheduling. However, in recent years an increase in the use of non-linear approaches has been observed, which consider a broader set of parameters and meteorological datasets [28,29].…”
Section: Introductionmentioning
confidence: 99%
“…They have observed that pumped energy storage has big potential to reduce environmental impact according to other energy storage options. Yao et al 30 have investigated the wind‐driven hydropumped energy storage system in the Yalong River Basin. They have aimed to develop a multi‐objective strategy which is storing wind energy and balancing intermittent variability of the wind energy.…”
Section: Introductionmentioning
confidence: 99%