2022
DOI: 10.1016/j.ijepes.2022.108000
|View full text |Cite
|
Sign up to set email alerts
|

Optimal ESS size calculation for ramp rate control of grid-connected microgrid based on the selection of accurate representative days

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2022
2022
2025
2025

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 22 publications
(8 citation statements)
references
References 44 publications
0
8
0
Order By: Relevance
“…The objective function (5) aims to minimize the total cost C total associated with the G&TEP model. This includes the investment costs of the power generation equipment C inv shown in equation ( 6), operational costs C ope shown in Equation ( 8), DR costs C dr shown in Equation ( 9), costs of curtailing renewable energy resources C newcurt shown in Equation (10), and costs of load loss C loadloss shown in Equation (11). Moreover, Equation ( 7) calculates the discount rate for the investment costs.…”
Section: Objectivementioning
confidence: 99%
See 1 more Smart Citation
“…The objective function (5) aims to minimize the total cost C total associated with the G&TEP model. This includes the investment costs of the power generation equipment C inv shown in equation ( 6), operational costs C ope shown in Equation ( 8), DR costs C dr shown in Equation ( 9), costs of curtailing renewable energy resources C newcurt shown in Equation (10), and costs of load loss C loadloss shown in Equation (11). Moreover, Equation ( 7) calculates the discount rate for the investment costs.…”
Section: Objectivementioning
confidence: 99%
“…This module was designed to simulate long-term operational conditions in an uncertain environment [9]. However, the complex nature of generation and transmission expansion planning (G&TEP) problems, which often span a large geographical area over several decades, presents a significant challenge in integrating a long-term operation simulation model into the planning process [10,11]. To maintain computational tractability, prevalent G&TEP models typically adopt a lower temporal resolution.…”
Section: Introductionmentioning
confidence: 99%
“…Arabali A., 2014 [36] Awad A., [37] Zhang Y., [38] Alsaidan I., 2017 [39] Zhang Y., [40] Fioriti D., [41] Amini M., 2021 [42] Tahir H., [43] The optimal size of the battery storage in the study [15] was determined, taking into account the depth of discharge to extend the life of the battery storage. This article discusses the firefly algorithm to achieve optimal scheduling that minimizes the overall cost of generation.…”
Section: Limitations Of the Power Grid Limitations Of The Bess Refmentioning
confidence: 99%
“…However, the quantification of the parametric uncertainties could have added an additional layer of insight and understanding to the associated multi-criteria decision-making analyses. Tahir et al [25] have also sought to optimally size energy storage systems, whilst taking into account the ramp rate control of the wider MG integrating the battery energy storage system. They have used representative days to reduce the cost expensiveness of the operation of the system.…”
Section: Literature Reviewmentioning
confidence: 99%