2016
DOI: 10.1016/j.ejor.2015.08.010
|View full text |Cite
|
Sign up to set email alerts
|

Optimal investment plan for dynamic thermal rating using benders decomposition

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
13
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 22 publications
(13 citation statements)
references
References 14 publications
0
13
0
Order By: Relevance
“…The reliability of the joint operation of OTS and DLR is assessed in [48], where the authors showed that instead of degrading system reliability, the combined OTS and DLR topology can improve system reliability. Investment planning and transmission expansion problem using reconfigurable networks and DLR are studied in [49][39] [50]. C. RESEARCH GAP However, the current literature about the DLR enforcement with OTS in scheduling of power system network is based on deterministic modeling.…”
Section: B Related Workmentioning
confidence: 99%
“…The reliability of the joint operation of OTS and DLR is assessed in [48], where the authors showed that instead of degrading system reliability, the combined OTS and DLR topology can improve system reliability. Investment planning and transmission expansion problem using reconfigurable networks and DLR are studied in [49][39] [50]. C. RESEARCH GAP However, the current literature about the DLR enforcement with OTS in scheduling of power system network is based on deterministic modeling.…”
Section: B Related Workmentioning
confidence: 99%
“…Constraints (1l)-(1m) and constraints (1n)-(1p) enforce the power flow and the capacity of each line in every hour of each representative day, respectively, where m l is a sufficiently large positive number (i.e., |m l | ≥ 2 • θ max [15]). The dynamic thermal capacity of any line equipped with DTR system is typically higher than its static thermal capacity [16] and thus the auxiliary variable ∆p lto and the constraints (1n)-(1p) are used to model this property. If any switchable line is closed (i.e., x lto = 1), constraint (1l)-(1m) and constraints (1n)-(1p) lead to p lto = y l • θ s(l)to − θ r(l)to and |p lto | ≤ p max l + ∆p lto , respectively; otherwise, constraints (1l)-(1m) are neutralized and constraints (1n)-(1p) lead to |p lto | = 0.…”
Section: The Proposed Dgandtp Modelmentioning
confidence: 99%
“…Given 365 vectors of historical observations pertaining to 365 daily 24-hour patterns of demands, wind power productions, (1-5),(2-6), (7)(8), , (11)(12)(13) (11-13), (15)(16), (16)(17), (26)(27)(28),(35-37),(36-37), (36-47),(39-48),(40-41), (56-58),(60-61)…”
Section: A the Clustering Algorithmmentioning
confidence: 99%
“…where U is a pre-determined uncertainty set, and definitions of the rest terms are the same with (7). O R denotes the value of (8), which is the sum of the first-stage decision costs and the worst-case second-stage decision costs.…”
Section: Distributionally Robust Opfmentioning
confidence: 99%