2012
DOI: 10.1016/j.epsr.2012.04.010
|View full text |Cite
|
Sign up to set email alerts
|

Optimal placement of PMUs with limited number of channels

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
29
0

Year Published

2014
2014
2022
2022

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 67 publications
(29 citation statements)
references
References 15 publications
0
29
0
Order By: Relevance
“…Therefore, the complicated monitoring and control issues of modern power systems, turns power engineers to make use of PMU capabilities to avoid or to mitigate the impact of the line outage or the loss of the PMU itself. For the above purpose, new tools like the Cellular Genetic Algorithm (CGA) have been developed to obtain the reliability goal by Miljanic et al [19]. The CGA is used for computing the minimum number of PMUs and their placement in case of limited availability of communication channels and branch outage as well.…”
Section: Pmu's Placement Approaches With Simulation Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…Therefore, the complicated monitoring and control issues of modern power systems, turns power engineers to make use of PMU capabilities to avoid or to mitigate the impact of the line outage or the loss of the PMU itself. For the above purpose, new tools like the Cellular Genetic Algorithm (CGA) have been developed to obtain the reliability goal by Miljanic et al [19]. The CGA is used for computing the minimum number of PMUs and their placement in case of limited availability of communication channels and branch outage as well.…”
Section: Pmu's Placement Approaches With Simulation Resultsmentioning
confidence: 99%
“…Again, graph theory plays a significant role in analyzing methods due to its ability to represent the topological configuration of power systems. Thus, Anderson et al [19] use graph theory for the topological analysis of the placement problem by considering the number of available channels and branch outages. The Binary Integer Programming method has its role in state estimation reliability studies, where the researcher of [20] has used this method for achieving a complete topological observability using minimum number of PMUs.…”
Section: Pmu's Placement Approaches With Simulation Resultsmentioning
confidence: 99%
“…For the above purpose, new tools like the Cellular Genetic Algorithm (CGA) have been developed to obtain the reliability goal by Miljanic et al [17]. The CGA is used for computing the minimum number of PMUs and their placement in case of limited availability of communication channels and branch outage as well.…”
Section: B Reliability Requirementsmentioning
confidence: 99%
“…they can measure currents of multiple lines (or branches), and are able to consider specific cases of outages [2], [3]. The common way to include multiple input channels is to use measurement Jacobian matrices, which are formed and analysed separately for every outage case.…”
Section: Introductionmentioning
confidence: 99%