2008
DOI: 10.1109/ccece.2008.4564558
|View full text |Cite
|
Sign up to set email alerts
|

Optimal PMU placement for power system observability considering secondary voltage control

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 19 publications
(8 citation statements)
references
References 12 publications
0
8
0
Order By: Relevance
“…The (ILP) integer linear programming based branch and bound method is used to find the optimal number and position for PMUs. In [87] authors proposed an optimal phasor measurement units (PMUs) placement algorithm for power system observability and also increasing the performance of secondary voltage control scheme. The OPP is formulated to minimize the number of PMU installations subject to full network observability and monitoring pilot buses of the system to improve secondary voltage control performance.…”
Section: Branch and Bound Methodsmentioning
confidence: 99%
“…The (ILP) integer linear programming based branch and bound method is used to find the optimal number and position for PMUs. In [87] authors proposed an optimal phasor measurement units (PMUs) placement algorithm for power system observability and also increasing the performance of secondary voltage control scheme. The OPP is formulated to minimize the number of PMU installations subject to full network observability and monitoring pilot buses of the system to improve secondary voltage control performance.…”
Section: Branch and Bound Methodsmentioning
confidence: 99%
“…Branch and bound (B&B) method was proposed by Mohammadi-Ivatloo and Hosseini. [20] to solve an OPP problem considering secondary voltage control. Nonlinear constraints were formed when considering an adjacent zero-injection bus based on the hybrid topology transformation.…”
Section: Introductionmentioning
confidence: 99%
“…In PDC, the measured data from the whole power system are synchronized by using the time stamps. This information provides great potential for many applications including power system state estimation , wide‐area control and monitoring , fault location and detection , wide‐area protection , transient stability analysis and prediction , online small signal stability analysis , parameter identification of transmission lines , and power system restoration .…”
Section: Introductionmentioning
confidence: 99%