2001
DOI: 10.1142/9789812811868_0006
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Preparedness Maintenance of Multi-Unit Systems With Imperfect Maintenance and Economic Dependence

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
7
0

Year Published

2008
2008
2020
2020

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 11 publications
(7 citation statements)
references
References 12 publications
0
7
0
Order By: Relevance
“…Some systems can only accept maintenance actions before given tasks, that is, defects may be tested while the systems are in storage. This includes rocket engines, missiles, and so on [17]. Here, we only study the situation that maintenance actions can be taken at any time.…”
Section: Assumptionsmentioning
confidence: 99%
“…Some systems can only accept maintenance actions before given tasks, that is, defects may be tested while the systems are in storage. This includes rocket engines, missiles, and so on [17]. Here, we only study the situation that maintenance actions can be taken at any time.…”
Section: Assumptionsmentioning
confidence: 99%
“…The selected approach highly conditions the adequacy of the maintenance strategy [33]. In the case of WTs, it is important to select one that takes into account the multi-component nature of the turbines [34,35].…”
Section: Background and Introductionmentioning
confidence: 99%
“…The WTs are composed of several subsystems with dependencies among them that can be classified as (i) economic, where the simultaneous performance of maintenance activities implies different economic consequences that implement them individually [36]; (ii) structural, where maintenance actions on one system may imply maintenance activities on others [37]; and (iii) stochastic, where the failure hazard of two different systems are not independent [38]. In this context, opportunistic maintenance policies are the most suitable, and therefore they have been widely researched [33].…”
Section: Background and Introductionmentioning
confidence: 99%
“…Gustavsson et al (2014) proposed a preventive maintenance (PM) scheduling over a finite and discretized time horizon based on the interval costs. Maintenance optimization models of multi-component systems are widely reviewed in by Dekker et al (1997), Nicolai and Dekker (2008), Wang (2002), Pham and Wang (1996), Wang and Pham (2006), Nowakowski and Werbińka (2009), and Wu and Zuo (2010). Bai and Pham (2006) have presented some results for multi-component systems on renewable full-service warranty policies.…”
Section: Introductionmentioning
confidence: 99%