Optimal Preventive Maintenance Planning for Electric Power Distribution Systems Using Failure Rates and Game Theory

Abstract: Current electric utilities must achieve reliability enhancement of considerable distribution feeders with an economical budget. Thus, optimal preventive maintenance planning is required to balance the benefits and costs of maintenance programs. In this research, the proposed method determines the time-varying failure rate of each feeder to evaluate the likelihood of future interruptions. Meanwhile, the consequences of feeder interruptions are estimated using interruption energy rates, customer-minutes of inter… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(8 citation statements)
references
References 33 publications
0
8
0
Order By: Relevance
“…The power interrupted cost is obtained by multiplying the power interruption duration by the power interruption rate of load points. This power interrupted cost is computed as in [38] by replacing the number of customers interrupted by the power interrupted at load points. The power interrupted cost of feeder 𝑓 due to cause 𝑐 is given as…”
Section: Risk Assessmentmentioning
confidence: 99%
See 3 more Smart Citations
“…The power interrupted cost is obtained by multiplying the power interruption duration by the power interruption rate of load points. This power interrupted cost is computed as in [38] by replacing the number of customers interrupted by the power interrupted at load points. The power interrupted cost of feeder 𝑓 due to cause 𝑐 is given as…”
Section: Risk Assessmentmentioning
confidence: 99%
“…Their values are 0.026, 0.79, and 0.70 for equipment failure, tree contact, and bushfire respectively. The benefits of preventive maintenance tasks are expressed as in [38] and given by…”
Section: Evaluation Of Preventive Maintenancementioning
confidence: 99%
See 2 more Smart Citations
“…The data required for the reliability analysis of the KSW-460NE shearer subassemblies have been collected for two years, which allowed us to determine the mean operating time between failures (MTBF) [26,27], and the mean time to repair (MTR) [27,28] and failure rate. Many of the preventive maintenance [29][30][31][32][33][34][35] work should be conducted at regular intervals. It is difficult to establish an optimum duration and it should be based on information regarding the function of failure rate, probable consequences, and costs of the preventive maintenance work, which should prevent failure, cost, and risk of the preventive maintenance work, etc.…”
Section: Introductionmentioning
confidence: 99%