This article presents a novel approach to optimise scheduling and production planning to meet seasonal demand in an industrial process using decaying catalysts, based on its formulation as a multistage mixed-integer optimal control problem (MSMIOCP). Unlike existing methodologies, the MSMIOCP formulation allows to solve this problem as a standard nonlinear optimisation problem without combinatorial optimisation methods, which can be advantageous in providing reliable, robust and e cient solutions. Using this formulation, four case studies of this problem, di↵ering in reaction or deactivation kinetics, are investigated. Two di↵erent solution implementations are used, each having their own relative advantages. The first implementation demonstrates a bang-bang behaviour for the linear scheduling controls, consistent with a theoretical analysis, but faces integration problems and does not always produce high quality solutions. The second implementation, while not demonstrating the bang-bang property, always produces high quality solutions and shows the advantages of the MSMIOCP formulation over existing methodologies.