“…To analyse the effect of the wind farm integration, the DC-SCUC model is adopted to optimise the calculation of the system, which is connected with or without the wind power. Furthermore, the 1-3,7,12,14,16,18,22,31,36,39,41,46,49,50,54 000000000000000000000000 [4][5][6][8][9][10][11]13,15,17,[19][20][21]23,[25][26][27][28][29][30]32,35,37,38,40,[42][43][44][45]48,51,53 111111111111111111111111 ACPF-based constraints are utilised to check the results, as shown in Table 5. In Table 5, the total cost of the system is reduced after the wind power integration.…”