2017
DOI: 10.1049/iet-smt.2017.0064
|View full text |Cite
|
Sign up to set email alerts
|

Optimisation of antenna array allocation for partial discharge localisation in air‐insulated substation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 26 publications
0
4
0
Order By: Relevance
“…Here, eight antennas were adopted and two reference arrays (R1 and R2) with regular distributions were selected, as shown in Figure 8a. The CRLB and RMSE curves were compared, whereby the RMSE simulation was performed according to [14] and the setting parameters were the same as those in the CRLB calculation. The Chan algorithm was adopted to solve the PD coordinates in the RMSE simulation.…”
Section: Array Deployment For Coordinate Estimationmentioning
confidence: 99%
See 2 more Smart Citations
“…Here, eight antennas were adopted and two reference arrays (R1 and R2) with regular distributions were selected, as shown in Figure 8a. The CRLB and RMSE curves were compared, whereby the RMSE simulation was performed according to [14] and the setting parameters were the same as those in the CRLB calculation. The Chan algorithm was adopted to solve the PD coordinates in the RMSE simulation.…”
Section: Array Deployment For Coordinate Estimationmentioning
confidence: 99%
“…To accurately estimate the coordinates of PD sources, the antenna array needs to be placed on a broad space with a length greater than 4 m and is generally mounted on the roof of the control room [4,14]. Under these circumstances, the distance between the antenna array and discharge sources, that is, the distance between the equipment area and control room, is relatively large.…”
Section: Coordinate Estimationmentioning
confidence: 99%
See 1 more Smart Citation
“…Thus, a careful management of such capital assets has become an important objective for different power firms [1]. PD occurs when the electric field stress inside an insulator exceeds its breakdown strength due to the high applied voltage, an ionization of atoms could possibly take place producing a high-frequency transient current inside the insulation material [2], [3]. Even though PDs might be initially very small, the generated current might gradually cause chemical decomposition of the insulator causing erosion with time.…”
Section: Introductionmentioning
confidence: 99%