2017
DOI: 10.1177/0954409717721634
|View full text |Cite
|
Sign up to set email alerts
|

Optimisation of schedules for the inspection of railway tracks

Abstract: Where a licence is displayed above, please note the terms and conditions of the licence govern your use of this document. When citing, please reference the published version. Take down policy While the University of Birmingham exercises care and attention in making items available there are rare occasions when an item has been uploaded in error or has been deemed to be commercially or otherwise sensitive.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
11
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
7
1

Relationship

3
5

Authors

Journals

citations
Cited by 15 publications
(11 citation statements)
references
References 46 publications
0
11
0
Order By: Relevance
“…Various approaches exist for the track inspection scheduling problem which can be formulated as a function of the track, available equipment, labor and time (Bin Osman et al 2018). In a recent study, a multi-objective optimisation approach (i.e., maintenance cost and train delays set as objective functions) is proposed to handle the track maintenance scheduling problem together with a developed track degradation model.…”
Section: Diagnosis and Maintenance Issuesmentioning
confidence: 99%
“…Various approaches exist for the track inspection scheduling problem which can be formulated as a function of the track, available equipment, labor and time (Bin Osman et al 2018). In a recent study, a multi-objective optimisation approach (i.e., maintenance cost and train delays set as objective functions) is proposed to handle the track maintenance scheduling problem together with a developed track degradation model.…”
Section: Diagnosis and Maintenance Issuesmentioning
confidence: 99%
“…Track inspection has formed an integral part of railway operation and maintenance of a railway network (Esveld, 2001;Remennikov and Kaewunruen, 2008;Indraratna et al, 2011;Bin Osman et al, 2018). Creating added value from inspection data has been paid a special attention by many researchers around the world over the past three or four decades (Bin Osman and Kaewunruen and Chiengson, 2018;Ngamkhanong et al, 2018b).…”
Section: Introductionmentioning
confidence: 99%
“…consuming. An imminent failure of any critical component at a specific location can cause further damage of infrastructure, giving risks of detrimental train derailments [4][5][6].…”
Section: Introductionmentioning
confidence: 99%