2019
DOI: 10.1016/j.buildenv.2019.106247
|View full text |Cite
|
Sign up to set email alerts
|

Optimising choices of ‘building services’ for green building: Interdependence and life cycle costing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 27 publications
(9 citation statements)
references
References 17 publications
0
8
0
1
Order By: Relevance
“…It does not add additional construction difficulty, and the total cost does not increase much. However, it can reduce the repair cost of the waterproof layer, prolong the service life of the roof, and bring long-term benefits [ 10 ]. However, several problems have also emerged in the practical application of inverted roofs, such as the infiltration of rainwater into the gaps between the roof insulation boards, which can result in a decrease in the overall insulation performance of the roof.…”
Section: Related Workmentioning
confidence: 99%
See 1 more Smart Citation
“…It does not add additional construction difficulty, and the total cost does not increase much. However, it can reduce the repair cost of the waterproof layer, prolong the service life of the roof, and bring long-term benefits [ 10 ]. However, several problems have also emerged in the practical application of inverted roofs, such as the infiltration of rainwater into the gaps between the roof insulation boards, which can result in a decrease in the overall insulation performance of the roof.…”
Section: Related Workmentioning
confidence: 99%
“…It does not add additional construction difficulty, and the total cost does not increase much. However, it can reduce the repair cost of the waterproof layer, prolong the service life of the roof, and bring long-term benefits [ 10 ].…”
Section: Related Workmentioning
confidence: 99%
“…Keadah manual ini masih boleh digunakan, namun begitu kaedah ini sudah ketinggalan dan menggunakan masa yang banyak untuk mengisi dan mengaturkan kerja penyelenggaraan, selain data mudah hilang semasa fasa merekod. Kaedah ini juga tidak sesuai jika data yang perlu diisi adalah besar dan kompleks kerana ia menyebabkan operasi yang perlahan dan menggunakan masa yang panjang [19]. Selain itu, perkembangan teknologi juga memberi kesan negatif kerana tidak semua organisasi dan bangunan mampu mengguna dan mengintegrasikan teknologi sedia ada bersama teknologi yang baru, dan ini akan meningkatkan kerja dan kos selenggara apabila perlu menggantikan teknologi lama [9].…”
Section: Teknikal Dan Teknologiunclassified
“…However, because China's green building standard system is not perfect, and foreign green building evaluation systems, such as BREEAM and LEED, are not suitable for China's national conditions, the performance of most domestic green buildings in the operation stage cannot be effectively evaluated [5]. In addition, at the current stage, the design capacity for the whole life cycle of green buildings is insufficient and the scale production efficiency is low, which ultimately causes the production cost of green buildings in China to be much higher than that of traditional construction methods [6]. According to the calculation, the total incremental cost of green building projects in China is approximately 260 yuan/m 2 [7], which restricts the willingness of developers and construction units to build green buildings to a certain extent.…”
Section: Introductionmentioning
confidence: 99%