Optimization of high-level preventive maintenance scheduling for high-speed trains

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
36
0
1

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 81 publications
(37 citation statements)
references
References 27 publications
0
36
0
1
Order By: Relevance
“…The network includes 17 substations, 26 transmission lines, and 99 CBs. In Table 2, values of M x , P x , E x , T x , and S x of CBs are determined in accordance with (5), (7), (9), (11), and (13), respectively. In addition, based on (3), (4), (6), (8), and (10), the rates of the four failure types of CBs are calculated.…”
Section: The Statistical Study Of Cb Failures In the Krecmentioning
confidence: 99%
“…The network includes 17 substations, 26 transmission lines, and 99 CBs. In Table 2, values of M x , P x , E x , T x , and S x of CBs are determined in accordance with (5), (7), (9), (11), and (13), respectively. In addition, based on (3), (4), (6), (8), and (10), the rates of the four failure types of CBs are calculated.…”
Section: The Statistical Study Of Cb Failures In the Krecmentioning
confidence: 99%
“…The dates when the train-sets should be withdrawn from service and sent to the maintenance center are crucial for the rolling stock operator as well as for the planning at the maintenance center. Given that the heavy maintenance of a train-set is a long process, both, rolling stock operator and maintenance center, need to specify at least for a year when the heavy maintenance of each train-set should commence [10], [15]. Furthermore, often the transportation of passengers and the rolling stock heavy maintenance are carried out by two separate organizations which operate on the basis of a long term contract that specifies for each train-set the precise date of the commencement of its maintenance.…”
mentioning
confidence: 99%
“…The heavy maintenance has a validity period after which another heavy maintenance procedure must take place according to the engineering restrictions. Consequently, the rolling stock operator determines for every train-set a time window within which the maintenance of this train-set should commence (see, for example, [10]). The length of such time window depends on the practice of the rolling stock operator and in some cases can be zero (see, for example, [15]).…”
mentioning
confidence: 99%
See 2 more Smart Citations