2017 11th IEEE International Conference on Compatibility, Power Electronics and Power Engineering (CPE-POWERENG) 2017
DOI: 10.1109/cpe.2017.7915147
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of power plant AVR parameters to improve transient voltage stability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 7 publications
0
4
0
Order By: Relevance
“…The level of reliability of the functioning of the energy system is determined, along with other factors, the reliability and operational characteristics of the used electric power equipment, control devices and systems, including the characteristics of microprocessor-based devices for automatic control, protection and automation [13]. At the same time, products offered on the electric power market are not always free from algorithmic and software errors, and adaptation to operating conditions in power systems is not performed properly [14].…”
Section: Methodsmentioning
confidence: 99%
“…The level of reliability of the functioning of the energy system is determined, along with other factors, the reliability and operational characteristics of the used electric power equipment, control devices and systems, including the characteristics of microprocessor-based devices for automatic control, protection and automation [13]. At the same time, products offered on the electric power market are not always free from algorithmic and software errors, and adaptation to operating conditions in power systems is not performed properly [14].…”
Section: Methodsmentioning
confidence: 99%
“…1 and used in HRTSim, has been used as the basis for the research. This structural scheme of AVR mathematical model synthesized on the basis of the analysis of different existing excitation systems and AVR [11,12], that allows to consider significant factors and elements for the adequate simulation of regulators.…”
Section: Methodsmentioning
confidence: 99%
“…Some literature discussions are on Voltage Regulation Distribution Transformer using On Load Tap Changer [29], Automatic Voltage Regulator (AVR) at generation side [30], and fuzzy logic based coordinated Power System Stabilizer (PSS), together with AVR at the generation side [31]. Others include synchronous Condensers (SC) with techno-economic analysis in [32,33], mechanically switched capacitors [34], and coordinated control between the switched capacitors and Static Synchronous Compensator (STATCOM) to avoid square voltage fluctuations [35].…”
Section: Introductionmentioning
confidence: 99%