2019
DOI: 10.1016/j.jnggs.2019.03.003
|View full text |Cite
|
Sign up to set email alerts
|

Optimize production allocation for the oil-gas field basing on a novel grey model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 12 publications
(4 citation statements)
references
References 13 publications
0
4
0
Order By: Relevance
“…The TDPGM is one of the models with good predictive applicability. The Time-Delayed Polynomial Fractional Grey Model (TDPFOGM) was proposed based on the TDPGM model (Chen et al, 2019). The Time-Delayed Polynomial Fractional Grey Model (TDPFOGM) is mathematically represented as:…”
Section: Novel Grey Model (Gm) For Gas Lift Optimizationmentioning
confidence: 99%
“…The TDPGM is one of the models with good predictive applicability. The Time-Delayed Polynomial Fractional Grey Model (TDPFOGM) was proposed based on the TDPGM model (Chen et al, 2019). The Time-Delayed Polynomial Fractional Grey Model (TDPFOGM) is mathematically represented as:…”
Section: Novel Grey Model (Gm) For Gas Lift Optimizationmentioning
confidence: 99%
“…The prediction accuracy of the grey model is limited by the distribution of the data. Once the accumulated data deviated from the natural exponential a b c law, underfitting or overfitting would occur and the prediction effect of the Grey model would deviate from the actual value [21][22][23][24]. The exponential smoothing model applies the linear combination of time series to represent the prediction value at the next moment.…”
Section: Introductionmentioning
confidence: 99%
“…The fluid viscosity of the oil-gas reservoir [1,2] is the key factor to determine the final development effect and economic benefit of the oil-gas reservoir. Therefore, it has become an important basis performance for formulating oil-gas field development plans [3], studying oil and gas reservoir performance, implementing plan adjustment, and evaluating stimulation [4].…”
Section: Introductionmentioning
confidence: 99%