Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
42
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
4
1

Relationship

2
8

Authors

Journals

citations
Cited by 95 publications
(50 citation statements)
references
References 50 publications
0
42
0
Order By: Relevance
“…Finally, schedule management is one of the indicators used to assess the technical capacity of the contractor. The construction schedule of the work performed by the contractor must be in line with the overall progress of the project approved by the project owner (Luong et al, 2018;Nguyen et al, 2018c). The purpose of planning and managing the project schedule is to set the sequence of tasks (Khan et al, 2017).…”
Section: Resultsmentioning
confidence: 99%
“…Finally, schedule management is one of the indicators used to assess the technical capacity of the contractor. The construction schedule of the work performed by the contractor must be in line with the overall progress of the project approved by the project owner (Luong et al, 2018;Nguyen et al, 2018c). The purpose of planning and managing the project schedule is to set the sequence of tasks (Khan et al, 2017).…”
Section: Resultsmentioning
confidence: 99%
“…The construction project schedule and time required must be captured and managed in both individual and assigned tasks using appropriate tools [4]. Delays occur in almost every construction project, and the magnitude of delay varies considerably from project to project, ranging from a few days to several years [5,6]. Many difficulties occur during the execution of a project, and, in practice, the schedule is likely to be altered.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Quality is the major focus because it is key to productivity and cost reduction . However, it is a multi-dimensional and contextual concept (Luong et al, 2018). Therefore, quality characteristics need to be detailed to be improved.…”
Section: Literature Reviewmentioning
confidence: 99%