Parameter Estimation of User-Defined Control System Models forItaipú Power Plant using Modelica and OpenIPSL

Abstract: The power industry heavily relies on power system modeling to understand system operations, perform system planning studies, and identify and correct problems that arise within the system. By minimizing the error between the models and actual physical system, it can be ensured that the models provide representation of both the existing and future the power system. Many of these models in the system are user-defined, i.e. they are specialized representations of a specific system component in the system. It is i… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…Additional cases of the generator parameter changes will be studied in the future when appropriate real-world data is available, analyzing changes to both the excitation system and mechanical system, which will result in changed behavior in the swing equations. Gain on signal 2 input V ST,max PSS output max limit V ST,min PSS output min limit V SI1,max Input signal 1 max limit V SI1,min Input signal 1 min limit V SI2,max Input signal 2 max limit V SI2,min Input signal 2…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Additional cases of the generator parameter changes will be studied in the future when appropriate real-world data is available, analyzing changes to both the excitation system and mechanical system, which will result in changed behavior in the swing equations. Gain on signal 2 input V ST,max PSS output max limit V ST,min PSS output min limit V SI1,max Input signal 1 max limit V SI1,min Input signal 1 min limit V SI2,max Input signal 2 max limit V SI2,min Input signal 2…”
Section: Discussionmentioning
confidence: 99%
“…This work builds off of the work in [2] and [3], which focuses on parameter estimation for the Itaipù hydroelectric plant. Itaipuìs about 20 times larger than Mostarsko, using PMU data from various faults and system disturbances.…”