2019
DOI: 10.1016/j.ijepes.2018.10.029
|View full text |Cite
|
Sign up to set email alerts
|

Parametric uncertainty in affecting transient characteristics of multi-parallel hydropower systems in the successive load rejection

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
9

Relationship

5
4

Authors

Journals

citations
Cited by 20 publications
(11 citation statements)
references
References 28 publications
0
11
0
Order By: Relevance
“…Components of the HTGS exhibit strong nonlinearity, such as the hydro-turbine and governor [108,109], and many uncertain factors exist in structural parameters because of equipment aging and unit vibrations [33]. Modeling HTGS is, therefore, an important and difficult task.…”
Section: Htgs Modelsmentioning
confidence: 99%
“…Components of the HTGS exhibit strong nonlinearity, such as the hydro-turbine and governor [108,109], and many uncertain factors exist in structural parameters because of equipment aging and unit vibrations [33]. Modeling HTGS is, therefore, an important and difficult task.…”
Section: Htgs Modelsmentioning
confidence: 99%
“…To overcome the limitations of local methods (linearity and local variations), global sensitivity analysis considering the whole variation range of the inputs was developed in the late 1980s [35]. The extended Fourier amplitude sensitivity test (EFAST) is one of the most commonly used global sensitivity analysis methods, since it studies the influence of each parameter and the interaction of parameters on system output when multiple parameters change simultaneously [39]. Please see Xu et al, for detailed information about EFAST [40].…”
Section: Sensitivity Analysismentioning
confidence: 99%
“…The conventional FSPSP utilises synchronous generator. The adjustment of mechanical power is realised by guide vane opening while reactive power is regulated by field current [12, 15, 21]. Lagging and leading phase operation are two normal operating modes under high and low field currents [31, 32].…”
Section: Theory and Properties Of Leading Phase Operation Of Fspsp mentioning
confidence: 99%
“…The number of theoretical and experimental researches have been conducted to analyse operational performances and power/frequency regulation ability of PSP. Xu et al [15] built a model of multi‐parallel hydropower system and utilised global sensitivity analysis to assess the contributions of different parameters during the process of successive load rejection. Li et al [13] built an integrated hydraulic‐mechanical‐electrical model of PSP and analysed the dynamic characteristics of a PSP in pumping phase modulation.…”
Section: Introductionmentioning
confidence: 99%