1951
DOI: 10.1680/ijoti.1951.12757
|View full text |Cite
|
Sign up to set email alerts
|

Part Reconstruction of Bo-Peep Tunnel at St Leonards-on-Sea. Railway Paper No 40. (Includes Plates).

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2000
2000
2000
2000

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Remedial work may entail the provision of a new invert in short lengths accompanied by temporary propping between the footings. The Bopeep Tunnel (Campion 1967) provides an example of a tunnel collapse when such remedial work was not undertaken in time, leading to a parallel-sided block failure extending to the ground surface.…”
Section: Defects During Operationmentioning
confidence: 99%
“…Remedial work may entail the provision of a new invert in short lengths accompanied by temporary propping between the footings. The Bopeep Tunnel (Campion 1967) provides an example of a tunnel collapse when such remedial work was not undertaken in time, leading to a parallel-sided block failure extending to the ground surface.…”
Section: Defects During Operationmentioning
confidence: 99%