2018
DOI: 10.22219/jtiumm.vol19.no2.107-117
|View full text |Cite
|
Sign up to set email alerts
|

Penentuan Prioritas Strategi Pengelolaan K3 Proyek Pemasangan Pipa Gas Menggunakan Pendekatan Metode AHP

Abstract: The pipeline is an immobile transport medium that functions to distribute liquids and gases. The pipeline installation project is one of the Engineering Procurement and Construction (EPC) projects that has the potential for accident and occupational safety risks. The purpose of this research is to determine the priority of work accident management strategies gas pipeline by applying the AHP method. Brainstorming and pair-wise comparison approaches were conducted by experts. A total of three experts are used as… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
2
1
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 15 publications
0
2
0
1
Order By: Relevance
“…In the context of this study, the brainstorming method from the behavioural methods is undertaken which is a qualitative method. It is a method within the heuristic methods that involves both creativity and brainstorming new ideas and arguments (Agustini and Rimantho 2018). It starts with selecting a lead to guide the assembly with the following tasks: classifying the problem, selecting members where five to ten is recommended, selection of (1) ; (Miszewska et al 2020) length where 45 min is recommended, selection of location of the assembly to perform a session, demonstration of guidelines, interpretation of outcomes (Miszewska et al 2020).…”
Section: Group Decision Makingmentioning
confidence: 99%
“…In the context of this study, the brainstorming method from the behavioural methods is undertaken which is a qualitative method. It is a method within the heuristic methods that involves both creativity and brainstorming new ideas and arguments (Agustini and Rimantho 2018). It starts with selecting a lead to guide the assembly with the following tasks: classifying the problem, selecting members where five to ten is recommended, selection of (1) ; (Miszewska et al 2020) length where 45 min is recommended, selection of location of the assembly to perform a session, demonstration of guidelines, interpretation of outcomes (Miszewska et al 2020).…”
Section: Group Decision Makingmentioning
confidence: 99%
“…Risk is a measure for analyzing hazards (Smarandana et al, 2021). Risk identification involves those who are involved in assessing risk, what types of risks affect project activities (Agustini & Rimantho, 2018).…”
Section: Riskmentioning
confidence: 99%
“…Tanpa perencanaan K3 yang baik akan sulit mengidentifikasi dan melaksanakan program yang benarbenar harus diprioritaskan untuk dilaksanakan. 7 Ditinjau dari pedoman SMK3 menurut PP No 50 Tahun 2012, ditetapkan bahwa perencanaan K3 yang sesuai dengan persyaratan harus mempertimbangkan hasil penelaah awal, identifikasi potensi bahaya, penilaian risiko dan pengendalian risiko, kemudian merumuskan suatu program dengan tujuan yang jelas. 6 Perusahaan mengidentifikasi dan menentukan peraturan atau persyaratan K3 yang sesuai dengan prosedur K3 dan SMK3 yang diterapkan perusahaan.…”
Section: Hasil Dan Pembahasanunclassified