2021
DOI: 10.1007/s40313-021-00839-1
|View full text |Cite
|
Sign up to set email alerts
|

Performance Evaluation of Hydro Generating Units Through the AHP Method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 19 publications
0
3
0
Order By: Relevance
“…Planning preventive maintenance includes definition of intervention frequency and intervals, workforce and resource coordination, and part replacement management (Mena et al 2021 ). This is not a simple task, as the balance between reliability and maintenance cost must be considered (Lie and Chun 1986 ; Akl et al 2022 ; Kunz 2022 ; de Silva et al 2022 ). Shortening the maintenance interval and replacing parts before the end of service life impact the overall cost, due to the cumulative mean time to repair preventively (MTTR p ) and downtime cost (CHC) plus part cost (CC n ), while the postponement of maintenance interventions increases the mean time to repair correctively (MTTR c ), and higher failure rates are expected, due to reliability depletion, as shown in Fig.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Planning preventive maintenance includes definition of intervention frequency and intervals, workforce and resource coordination, and part replacement management (Mena et al 2021 ). This is not a simple task, as the balance between reliability and maintenance cost must be considered (Lie and Chun 1986 ; Akl et al 2022 ; Kunz 2022 ; de Silva et al 2022 ). Shortening the maintenance interval and replacing parts before the end of service life impact the overall cost, due to the cumulative mean time to repair preventively (MTTR p ) and downtime cost (CHC) plus part cost (CC n ), while the postponement of maintenance interventions increases the mean time to repair correctively (MTTR c ), and higher failure rates are expected, due to reliability depletion, as shown in Fig.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Among different methods to handle multidimensional analysis and to support decisions related to preventive maintenance issues, the Analytic Hierarchy Process (AHP), a structured technique of multicriteria decision analysis for organizing and analysing complex decisions, has been used by many researchers (Mostafa and Fahmy 2020;Mutlag and Dawood 2020;Wang 2021;de Silva et al 2022;Mathew et al 2022;Sidhu et al 2022), due to the fact that it can effectively handle the degree of uncertainty and assist in determining the optimal strategy for performing preventive maintenance. In the present study, we used the AHP to establish a preventive maintenance plan for a steel company straightening machine.…”
Section: Introductionmentioning
confidence: 99%
“…In [7][8][9], the authors address aspects of the AFA related to issues of a hydrological risk mitigation mechanism, which occurs as a result of the seasonality of the affluent flow. In [10], the authors apply the method of Analytic Hierarchy Process (AHP) to obtain a classification of Generating Units (GUs) observing indicators that impact the AFA. In [6], the authors propose an optimal maintenance schedule, observing operational and regulatory aspects for plants connected to the NIS.…”
Section: Introductionmentioning
confidence: 99%