2001
DOI: 10.1007/s001700170020
|View full text |Cite
|
Sign up to set email alerts
|

Performance Management of Communication Networks for Computer Integrated Manufacturing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
6
0

Year Published

2003
2003
2020
2020

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 7 publications
0
6
0
Order By: Relevance
“…The scalability studies are conducted on "ShenWei I," which demonstrates the effectiveness of our parallel solver, as discussed elsewhere [4][5][6]. It is a problem of modal analysis for a new type of Compressed Natural Gas (CNG) city bus as shown in Fig.…”
Section: Application and Effect Of Parallel Modal Analysismentioning
confidence: 99%
“…The scalability studies are conducted on "ShenWei I," which demonstrates the effectiveness of our parallel solver, as discussed elsewhere [4][5][6]. It is a problem of modal analysis for a new type of Compressed Natural Gas (CNG) city bus as shown in Fig.…”
Section: Application and Effect Of Parallel Modal Analysismentioning
confidence: 99%
“…Transmitting time must be reduced, because it affects adversely the operation of the system. The elapsed time during the data transmission is called network delay and must be taken into account in system design [6], [7] Profibus has an important advantage in data transmission and so it uses in various endustrial applications such as image transmission and robotics [8]- [10]. Furthermore, in Profibus network systems, various control methods like PID, Fuzzy Logic and Genetic Algorithm are implemented easily [11], [12].…”
Section: Introductionmentioning
confidence: 99%
“…When a globoidal cam is machining on a machine tool, many factors would inevitably contribute to the profile error. At present, two methods have been applied for solving the profile error of a globoidal cam: the vector method [1,2] and the normal line method [3][4][5][6][7][8][9][10][11]. According to the vector method, at first, the deviation vector, which was a vector from a point on the desired surface to the corresponding point on the surface actually machined, was determined; then the unit normal vector of the corresponding point on the surface actually machined was determined; after that the projection of the deviation vector on the normal vector was determined.…”
Section: Introductionmentioning
confidence: 99%