Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

3
19
0
1

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 40 publications
(23 citation statements)
references
References 16 publications
3
19
0
1
Order By: Relevance
“…In addition, Love's research [35] on rework construction projects showed that there was no difference in cost performance between different delivery methods. Tran et al [36] divided different projects into new projects, reconstruction projects, resurfacing restoration rehabilitation (3R) projects, intelligent transportation system-related projects and miscellaneous construction projects, and their research showed that 3R projects and miscellaneous projects which adopt DB had advantages in cost and schedule, and the construction intensity in new construction and reconstruction projects adopting DB was higher. According to the studies above, it can be concluded that no certain project delivery method has advantages in all aspects of performance.…”
Section: Project Transaction Mode and Project Performancementioning
confidence: 99%
“…In addition, Love's research [35] on rework construction projects showed that there was no difference in cost performance between different delivery methods. Tran et al [36] divided different projects into new projects, reconstruction projects, resurfacing restoration rehabilitation (3R) projects, intelligent transportation system-related projects and miscellaneous construction projects, and their research showed that 3R projects and miscellaneous projects which adopt DB had advantages in cost and schedule, and the construction intensity in new construction and reconstruction projects adopting DB was higher. According to the studies above, it can be concluded that no certain project delivery method has advantages in all aspects of performance.…”
Section: Project Transaction Mode and Project Performancementioning
confidence: 99%
“…Numerous research studies have compared the performance of contracting methods on highway projects (e.g., Gransberg and Molenaar 2019;Molenaar and Franz 2019;Antoine et al 2018;Chini et al 2018;Tran et al 2018b;Shrestha et al 2012;FHWA 2006;Molenaar 2003 ).…”
Section: Introductionmentioning
confidence: 99%
“…Numerous studies have compared the effectiveness of DB and DBB systems (FHWA, 2006(FHWA, , 2017Minchin Jr., Li, Issa, & Vargas, 2013;Park & Kwak, 2016;Shrestha, Migliaccio, O'Connor, & Gibson, 2007;Tran, Diraviam, & Minchin Jr, 2018). For instance, Sullivan et al (2017) is a representative example.…”
Section: Introduction and Description Of The Problemmentioning
confidence: 99%