2016
DOI: 10.1088/1748-0221/11/01/c01075
|View full text |Cite
|
Sign up to set email alerts
|

Performance of the EUSO-Balloon electronics

Abstract: the EUSO-Balloon instrument went for a night flight for several hours, 40 km above Timmins (Canada) balloon launching site, concretizing the hard work of an important part of the JEM-EUSO collaboration started 3 years before. This instrument consists of a telescope made of two lenses and a complex electronic chain divided in two main sub-systems: the PDM (Photo Detector Module) and the DP (Data Processor). Each of them is made of several innovative elements developed and tested in a short time. This paper pres… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2017
2017
2018
2018

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 2 publications
0
2
0
Order By: Relevance
“…In EUSO‐TA and EUSO‐Balloon experiments, the time difference was constant and about 3600 GTUs (it depended on each subsystems startup delay), so that a 5000 GTU value was chosen to allow for some jitter. This was due to the electronics of the subsystems, in particular to the lack of a command to reset the GTU counters on one of the two subsystems. In the EUSO‐SPB software, the reset command has been added in the updated firmware of both the CLKB and the CCB; therefore, the subsystems have a time difference always and exactly equal to 0 GTUs, with no appreciable jitter.…”
Section: The Cpu Softwarementioning
confidence: 99%
“…In EUSO‐TA and EUSO‐Balloon experiments, the time difference was constant and about 3600 GTUs (it depended on each subsystems startup delay), so that a 5000 GTU value was chosen to allow for some jitter. This was due to the electronics of the subsystems, in particular to the lack of a command to reset the GTU counters on one of the two subsystems. In the EUSO‐SPB software, the reset command has been added in the updated firmware of both the CLKB and the CCB; therefore, the subsystems have a time difference always and exactly equal to 0 GTUs, with no appreciable jitter.…”
Section: The Cpu Softwarementioning
confidence: 99%
“…The concept was presented in [4]. EUSO-Balloon [5] and EUSO-TA have HVPS about 20 cm away from PMTs, and HV in conveyed by special (white) cables (see…”
Section: High Voltage Power Supply Systemmentioning
confidence: 99%