2009
DOI: 10.1086/596324
|View full text |Cite
|
Sign up to set email alerts
|

Performance Pay and Managerial Experience in Multitask Teams: Evidence from within a Firm

Abstract: This article exploits a quasi-experimental setting to estimate the impact that a commonly used performance-related pay scheme had on branch performance in a large distribution firm. The scheme, which is based on the Balanced Scorecard, was implemented in all branches in one division but not in another. Branches from the second division are used as a control group. Our results suggest that the Balanced Scorecard had some impact but that it varied with branch characteristics, and, in particular, branches with mo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
71
0
4

Year Published

2014
2014
2020
2020

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 67 publications
(77 citation statements)
references
References 36 publications
2
71
0
4
Order By: Relevance
“…Empirical evidence from a case study about the introduction of a balanced scorecard (a monitoring tool based on a wide range of information on linked activities) in a large multinational firm showed that due to the complexity and the large number of indicators, the overall effect on performance was negligible, if not negative. Only experienced managers performed better as they were able to effectively allocate effort within the branch [13].…”
Section: Multitasking Agency Problemsmentioning
confidence: 99%
“…Empirical evidence from a case study about the introduction of a balanced scorecard (a monitoring tool based on a wide range of information on linked activities) in a large multinational firm showed that due to the complexity and the large number of indicators, the overall effect on performance was negligible, if not negative. Only experienced managers performed better as they were able to effectively allocate effort within the branch [13].…”
Section: Multitasking Agency Problemsmentioning
confidence: 99%
“…Pouze studie Ittnera a kol. [22] a Griffitha a Neelyho [15] neprokázaly pozitivní vliv mezi vyuÏíváním BSC a podnikovou v˘konností. Velmi dÛleÏité jsou závûry ze studie Braama, Nijsena [6], ktefií poukazují na to, Ïe vyuÏívání BSC naznamená automaticky zv˘‰ení podnikové v˘konnosti.…”
Section: Shrnutí V˘sledkû Empirick˘ch V˘zkumûunclassified
“…Zdroj: [6], [7], [8], [9], [15], [16], [22] 2, XVII, 2014 úzce propojeno se strategií podniku, mÛÏe naopak podnikovou v˘konnost sniÏovat. Za zmínku stojí i studie Bankera a kol.…”
Section: Tab 1: Pfiehled V˘sledkû V˘zkumn˘ch Studiíunclassified
See 2 more Smart Citations