2011
DOI: 10.1016/j.rgg.2011.05.009
|View full text |Cite
|
Sign up to set email alerts
|

Petrophysical interpretation of time-lapse electromagnetic sounding in wells

Abstract: Terrigenous reservoirs are studied by a joint analysis of processes of various physical nature. This study is urgent because new methods for formation evaluation (first of all, permeability) from electric and electromagnetic logging data are required. We propose a method for the complex processing and interpretation of time-lapse well logging electromagnetic measurements, which show the dynamics of processes in the well influence zone. The constructed electrohydrodynamic model of the borehole environment is us… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2012
2012
2020
2020

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 7 publications
0
3
0
Order By: Relevance
“…e numerical characteristic parameters can be obtained by formulas (11) and (12), as shown in Table 2. e trends of the numerical characteristic parameters at different levels are shown in Figure 12 and 13.…”
Section: Extraction Of Characteristic Parametermentioning
confidence: 99%
See 2 more Smart Citations
“…e numerical characteristic parameters can be obtained by formulas (11) and (12), as shown in Table 2. e trends of the numerical characteristic parameters at different levels are shown in Figure 12 and 13.…”
Section: Extraction Of Characteristic Parametermentioning
confidence: 99%
“…e VBTEM is based on improved detection by the transient electromagnetic method (TEM) in many engineering applications, such as geological advance prediction of tunnels, underground gas storage, and metal mineral exploration [7][8][9][10][11][12][13][14]. e VBTEM has the common characteristics of transient electromagnetic in other fields, but also has its differences, which means that some issues need to be discussed before applying VBTEM technology into operational tunnels.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation