2005
DOI: 10.1007/11605300_13
|View full text |Cite
|
Sign up to set email alerts
|

Pitfalls in Parallel Job Scheduling Evaluation

Abstract: Abstract. There are many choices to make when evaluating the performance of a complex system. In the context of parallel job scheduling, one must decide what workload to use and what measurements to take. These decisions sometimes have subtle implications that are easy to overlook. In this paper we document numerous pitfalls one may fall into, with the hope of providing at least some help in avoiding them. Along the way, we also identify topics that could benefit from additional research.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
41
0

Year Published

2008
2008
2015
2015

Publication Types

Select...
5
2
1

Relationship

1
7

Authors

Journals

citations
Cited by 61 publications
(41 citation statements)
references
References 83 publications
0
41
0
Order By: Relevance
“…Choosing an appropriate performance metric is a hard decision to make [2]. This is because different scheduling scenarios can have different ways quality of service can be envisaged.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…Choosing an appropriate performance metric is a hard decision to make [2]. This is because different scheduling scenarios can have different ways quality of service can be envisaged.…”
Section: Discussionmentioning
confidence: 99%
“…Other performance metrics include Average Waiting Time (AWT), Job Slow-down (JSD) and throughput. An appropriate metric depends on the scheduling environment [2]. In a real time scenario for example, AWT is not an appropriate metric.…”
Section: Performancementioning
confidence: 99%
See 1 more Smart Citation
“…Maximizing utilization, in job scheduling, however, can be at odds with responsiveness and fairness [9,11,25]. In particular, Web schedulers have the choice of collocating jobs from different SLA tiers on the same compute nodes, or of allocating dedicated nodes for each desired tier.…”
Section: Compute Node Sharingmentioning
confidence: 99%
“…The choice of the measurement metric for parallel job scheduling evaluation has to be taken with a lot of care [14]. Some metrics may have different implications depending on the circumstance.…”
Section: Related Workmentioning
confidence: 99%