2020
DOI: 10.1016/j.scs.2019.101985
|View full text |Cite
|
Sign up to set email alerts
|

Place and memory indicator: Methodology for the formulation of a qualitative indicator, named place and memory, with the intent of contributing to previous works of intervention and restoration of heritage spaces and buildings, in the aspect of sustainability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(4 citation statements)
references
References 3 publications
0
4
0
Order By: Relevance
“…Multiple functions were linked into a complex system of historic building groups and created abundant forms and values [15]. In addition, the facade, as one of the essential elements of the building form, contributes to the diversity of the built environment and thus becomes an element affecting sustainability [16]. The facade elements that convey values that positively impact the characteristics of historic building groups should be identified [17].…”
Section: Introductionmentioning
confidence: 99%
“…Multiple functions were linked into a complex system of historic building groups and created abundant forms and values [15]. In addition, the facade, as one of the essential elements of the building form, contributes to the diversity of the built environment and thus becomes an element affecting sustainability [16]. The facade elements that convey values that positively impact the characteristics of historic building groups should be identified [17].…”
Section: Introductionmentioning
confidence: 99%
“…As shown in Table 2, an in-depth study of the obstacles and challenges faced by stakeholders in the integration of BIM and sustainability practices during the construction phase [56,60]. Based on BIM to restore heritage buildings [74], post-earthquake buildings [75,76], and refurbished buildings [77]. Promote the implementation of the BIM platform to optimize the construction process, improve the quality of project transformation, and effectively track the project with visual data [63].…”
Section: Micro Scheme Analysismentioning
confidence: 99%
“…The establishment of urban reconstruction plan indicators can carry out quality inspections on existing buildings, reduce the vulnerability of buildings, and contribute to the evaluation and decision-making of the seismic capacity of buildings [76,77]. The protection of the building does not mean sticking to the old appearance, but it can be rebuilt into a resilient, sustainable, and green building with innovative materials and technology [74]. The main research methods used in this phase include case studies, literature review, interviews, and comparative analysis.…”
Section: Micro Scheme Analysismentioning
confidence: 99%
“…Previous studies on the evaluation of intervention-value relations, in the limits of architectural conservation, make use of conventional methods such as historical research, site survey, visual analysis and evaluation (Demel, 1996;Perring, 2009;S ¸ims ¸ek, 2009;Geleng€ ul Ekimci, 2011;Jahi c, 2016;Ornelas et al, 2016;G omez de C ozar et al, 2019;Samadzadehyazdi et al, 2020;De Leão Dornelles et al, 2020). Monumental ruins of archaeological sites (S ¸ims ¸ek, 2009; G omez de C ozar et al, 2019), monumental ruins in cities affected by war (Perring, 2009;Jahi c, 2016), industrial heritage (Samadzadehyazdi et al, 2020), schools, hospitals, baths, etc.…”
Section: Introductionmentioning
confidence: 99%