“…In order to determine the location, area, and volume of soil potentially requiring evaluation, management, or remediation, a massive Site characterization effort occurred at Rocky Flats, beginning in the late 1960s [14]. Between 1991 and 1999, nearly 2500 surface soil samples were collected and analyzed for 239/240 Pu and 241 Am across the Site to assess the level and extent of actinide contamination [15].…”