2021
DOI: 10.1007/s00128-020-03068-5
|View full text |Cite
|
Sign up to set email alerts
|

Pollution Load Capacity Calculation Study Based on Multi-objective System in Trans-boundary Area, Plain River Network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 14 publications
0
2
0
Order By: Relevance
“…We realize that important steps had been made toward improved understanding the environmental impacts of N pollution on water systems and associated pollution management by abundant local scale studies. These studies have generally provided more detailed spatial and temporal level of pollution status and associated source attribution by two types of approaches: site-level measurements, stable isotopes combined with statistical analysis (e.g., Bayesian analysis and 1-D mathematical equation for environmental capacity calculation) or small-scale process-based models such as SWAT and GBNP . However, providing such detailed-level assessments for the whole of China is theoretically possible but practically not feasible yet, as it requires substantial input data and measurements for calibration and validation.…”
Section: Resultsmentioning
confidence: 99%
“…We realize that important steps had been made toward improved understanding the environmental impacts of N pollution on water systems and associated pollution management by abundant local scale studies. These studies have generally provided more detailed spatial and temporal level of pollution status and associated source attribution by two types of approaches: site-level measurements, stable isotopes combined with statistical analysis (e.g., Bayesian analysis and 1-D mathematical equation for environmental capacity calculation) or small-scale process-based models such as SWAT and GBNP . However, providing such detailed-level assessments for the whole of China is theoretically possible but practically not feasible yet, as it requires substantial input data and measurements for calibration and validation.…”
Section: Resultsmentioning
confidence: 99%
“…Because of the complex geological conditions and many influencing factors in lava area, the experimental analysis of bridge engineering in karst area is carried out, and the calculation algorithm of vertical capacity of rock jacket pile in karst area by load transfer method is established [11]. The pollution load of plain river network is difficult to control, so a multi-objective system with multiple constraints is proposed, and the corresponding one-dimensional and 0-d models are established to calculate the load capacity [12]. Tower foundations in transmission line projects in western China are often affected by extreme weather.…”
Section: Introductionmentioning
confidence: 99%