2012
DOI: 10.1016/j.ijepes.2012.06.043
|View full text |Cite
|
Sign up to set email alerts
|

Power system restoration planning based on Wide Area Measurement System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 22 publications
(10 citation statements)
references
References 18 publications
0
10
0
Order By: Relevance
“…Ref. [76] presents a method for optimal restoration planning which uses observability analysis and power transfer distribution factor (PTDF) to decrease the overvoltages caused by energizing transmission lines with light load. The use of the WAMS at the early stages of restoration provides precise determination of generators loading steps.…”
Section: Wams and Cyber-attackmentioning
confidence: 99%
“…Ref. [76] presents a method for optimal restoration planning which uses observability analysis and power transfer distribution factor (PTDF) to decrease the overvoltages caused by energizing transmission lines with light load. The use of the WAMS at the early stages of restoration provides precise determination of generators loading steps.…”
Section: Wams and Cyber-attackmentioning
confidence: 99%
“…The objective of the PMU placement problem is to accomplish this task by using a minimum number of PMUs. For an n bus system, the PMU placement problem can be formulated using integer programming method as follows [5]: (1) where X is a binary decision variable vector, whose entries are defined as:…”
Section: Pmu Assisted Intentional Islandingmentioning
confidence: 99%
“…Sun W. et al applied mixed-integer linear programming (MILP) algorithm to identify the optimal start-up sequence of NBSUs [8]. An optimal restoration approach based on the Wide Area Measurement System (WAMS) was proposed by Nourizadeh S. et al [9]. Gu X. et al proposed an extended black-start restoration strategy, in view of the fact that some current black-start resources with large rated power can provide enough cranking power for more than one non-black-start unit (1) A coupled multi-objective optimization model is built, which takes account of the double uncertainty in restoration process and realizes source-load coordinated restoration.…”
Section: Introductionmentioning
confidence: 99%